Home/News/PVC Flooring Replacement and Renovation Steps - News

PVC Flooring Replacement and Renovation Steps

Published: 2026-07-30  |  Source: Gulin Commerce

This topic is a common issue in floor construction and maintenance. Drawing on years of construction experience, Suzhou Industrial Park Gulin Commerce Co., Ltd. provides professional guidance.

1. Key Steps

A standardized construction process is the foundation of floor quality. From base preparation to finished-product protection, every step must be strictly controlled.

2. Common Problems and Solutions

  • Base preparation: ensure the floor is level, dry and clean, with a levelness deviation of no more than 2mm per 2m;
  • Material preparation: deliver materials to the site 24 hours in advance to acclimatize to the ambient temperature;
  • Construction environment: keep the temperature at 15-30°C and relative humidity no higher than 75%;
  • Finished-product protection: no walking within 24 hours and no heavy loads within 72 hours after installation.

3. Precautions

We recommend hiring a professional construction team to ensure quality. Gulin Commerce provides professional installation services; welcome to consult us.

Suzhou Industrial Park Gulin Commerce Co., Ltd. provides one-stop flooring material selection, quotation and installation services. Welcome to call: 0512-68114680.

← Previous: How to Read Environmental Test Reports for Flooring Next: Renovating Old Floors: Lay Directly or Tear Out and Rebuild? Three Checks to Decide →

Get Your Custom Solution & Quote

Material selection · Site survey · Installation support · Samples / Pricing

Call 0512-68114680
Contact Us ← Back to News

Want to learn more about products or services? Welcome to consult.

Contact Us